Handover protocols

Tropical Loft · Padonan, Canggu · [date of issue]


The protocol signed by both sides on the day the keys change hands, room by room, including every defect found on the day. Published with buyer names redacted unless the buyer agreed to be named.

What the real document sets out

  1. Unit identification and date of handover
  2. Promised handover date against the actual date
  3. Condition of every room, recorded on the day
  4. Defect list raised by the buyer at handover, with the agreed rectification date
  5. Documents handed over: SLF, PBG, lease deed, as-built drawings, warranties, manuals
  6. Meter readings and utility account transfers
  7. Signatures of both parties
Signed[name][title], Rumah Archipelago and the buyer, jointly
Date[date]
DEMO
SEAL

This page is a demonstration placeholder built for a client review of the website. It contains no real permit numbers, no real signatures and no real personal data. Every number on it reads 0000 or [brackets] on purpose. Replace it with a scan of the executed document before this site goes anywhere near a buyer.

How to check this one yourself

Ask any developer for a completed protocol from a previous project with the defect list intact. A clean list means the list was not really taken.

Register entry

  • StatusPublished in the register
  • GroupD. Build: how we build
  • ProjectTropical Loft
  • DetailSigned by each buyer · promised Q1 2025 · actual 6 March 2025